Tabala Water Treatment Project
Project Type
Water Purification PlantClient
National Water CompanyLocation
AsirImplementation of a water purification plant on Wadi Tabala dam with a capacity of 50,000 cubic meters per day. The project consists of 6 transferable water paths with a capacity of 8400 cubic meters per day for one track, water collection tanks with a volume of 500 cubic meters, construction of annex buildings, an administrative and electrical building, a chemical treatment building, system Control, raw water pumping stations and water distribution network, Ashyaab.