Qiddiya Six Flags-Infrastructure Package
Supply, Installation, Testing & Commissioning of Infrastructure networks
Read MoreTabala Water Treatment Project
A small river named Duden flows by their place and supplies it with the necessary
Read MoreAqiq Water Treatment Project
A small river named Duden flows by their place and supplies it with the necessary
Read MoreGanaben Water Treatment Project
A small river named Duden flows by their place and supplies it with the necessary
Read MoreConstruction of Bisha Court House Building Complex
Construction Of Bisha Court House Building Complex.
Read MoreDevelopment & Improvement Of The Sewer Treatment Plant Project In Abha
Reformation of mechanical and electrical parts such as hobbies, pumps, crystals, air diffusers and their electrical panels, construction of warehouses and an administrative building.
Read MoreConstruction of water reservoir tanks Abu Skena, Muhail, Assir
20 Water Collection tanks with pumping station which pump 50000 m3/d toward Muhayel Asir tanks consist of power building , Chlorine building , Administration building , Control building , SEC building and distribution station.
Read MoreConstruction Of Sewage Treatment Plant, Rejal Alma, Assir
Construction of a sewage treatment plant with a capacity of 7500 cubic meters per day for the villages of Rijal Alma, In addition a pumping station, coarse, fine filters, aeration basins, brothels, sand filters, and water treatment purification systems.
Read MoreConstruction Of Reservoir Tank And Water Refilling Station, Rabiyah And Rafidah
Building a water distribution station consisting of 5000 cubic meters,12 manholes for water distribution, tanks, chlorine systems, pumping station, auxiliary buildings, administrative buildings, and warehouses.
Read MoreConstruction of pumping station "A" and reservoir tank for raw water from wajid wells
The project is re pumping station to receive coming water from PSB stationand re pump it. The project is consist of Administration building , Guard building and Control and Monitoring building and power building.
Read MoreConstruction of pumping station "B" and reservoir tank for raw water from wajid wells
The project is re pumping station to receive coming water from PSA station (ALWAJEED PROJECT) and re pump it. The project is consist of Administration building , Guard building and Control and Monitoring building and power building.
Read MorePhase 1 District Cooling and Gas Network - MISK City
Supply, Installation, and Commissioning of Pipelines: High-Density Polyethylene (HDPE) pipes with diameters extend between 63mm to 300mm with about 8000M in length. Most used diameters will be 250mm - Chambers: More than 30 Chambers for valves. - Soil Works: Trench/Backfill for around 9,000 Cubic Meters
Read MorePhase 1 District Cooling and Gas Network - MISK City
Supply, Installation, and Commissioning of Pipelines including but not limited to Pre-insulated Carbon Steel pipes with diameters extending between 80mm to 900mm with about 7300M in length. Most used diameters will be 700mm and 750mm double-line; main & return. - Chambers: More than 30 Chambers for valves, air vents, release, etc. - Soil Works: Trench/Backfill for around 12,000 Cubic Meters
Read MoreTahakom - Roadside CCTV Project
To design, procure, build, install, construct & configure, within a defined timeframe, all the civil and electromechanical work in connection to all CCTV-based projects. To provide construction plans of the civil work, including all related activities starting from sites survey, design, drawings (according to TAHAKOM’s drawings and design standards), installation …. etc. throughout to completion, which will be carried out at each of the sites prior to the issuance of the final Certificate of Acceptance.
Read MoreCCTV Supply & Installation with MOE
Supply and installation of CCTV anti-theft including integration for 85 schools in the south region.
Read MoreWet utility, electrical, communications Networks Implementation Contract – Wadi Hanifa Project - Phase1A&C
Execute, Supply, Installation, test and Commissioning of Pipelines including but not limited to Pre-insulated Carbon Steel pipes with diameters extending between 80mm to 900mm with about 7300M in length. Most used diameters will be 700mm and 750mm double-line; main & return. - Chambers: More than 30 Chambers for valves, air vents, release, etc. - Soil Works: Trench/Backfill for around 12,000 Cubic Meters
Read MoreConstruction of a Power Station - for the AL GIJAZ company
Providing Safety, Cutting of Asphalt, Trench Excavation & disposal of excess earth material to AMANA approved location, Fiber optic cable laying, Installation of joint closures, terminal equipment & accessories, splicing, testing, blowing, road boaring, installation of manhole & conduit systems, Back Filling with compaction according to AMANA/CLIENT requirements & all work related to FTTH including the supply of all required manpower, materials, equipment necessary to execute the work.
Read MoreNBB OSP Phase 2
OSP works for the Expansion of the National Broadband-Second phase (FTTH).
Read MoreBuilding Passive FTTH network infrastructure
Build Passive FTTH Infrastructure Netwrok which include civil works, material and fiber deployment in various cities within the Kingdom of Saudi Arabia.
Read MoreNetwork rehabilitation OSP Maintenance
Carryout the rehabilitation of STC FTTH & Copper networks over and under the ground, replacing more than 100 FDTs and more than 1000 FAT closures in addition to maintain and replace underground fiber and copper cables, OTBs, ODBs, etc.
Read More